We design and build custom robotic automation systems that increase precision, throughput, and safety. From robotic assembly cells to inspection fixtures and material-handling equipment, our engineers bring clarity to complex manufacturing environments.
phoenix
technologies
Custom Robotic Automation & Systems Integration


What We Do
Our core Technology capabilities
Mechanical Design
Phoenix Technologies engineers custom mechanical systems—including tooling, fixtures, and automation components—designed to improve throughput, precision, and operator safety. Every design is built to integrate seamlessly with your existing production environment.
Project Management
Our project managers oversee every phase of your automation program—from scoping and scheduling to vendor coordination and installation—ensuring projects stay on time, on budget, and aligned with your operational goals.
Robot/Cobot Programming
We develop and optimize robotic and collaborative robot programs that increase efficiency, reduce labor strain, and deliver consistent performance across shifts, applications, and part variations.
MiR Industrial Programming
Phoenix integrates and programs MiR autonomous mobile robots to streamline material flow, reduce manual transport, and create safer, more flexible movement inside modern manufacturing facilities.
Industrial Programming
Our controls team designs, programs, and integrates PLC, HMI, and safety systems across multiple platforms—delivering reliable automation that improves uptime and ensures every process runs with clarity and precision.
Machining & Fabrication
We machine and fabricate custom components, tooling, brackets, and fixtures in-house, ensuring fast turnaround, exact tolerances, and engineering alignment from first prototype to final production asset.

"The Phoenix Group has been our strategic logistics partner since 2005. Their Columbus, IN assembly operations manage an extremely important part of our business with an automotive customer. They provide a true turnkey solution that ensures we exceed our customer’s quality, cost, and delivery expectations."
Robert Hill, President & CEO
Alps Alipine North America, Inc.
"Phoenix Technologies designed and manufactured the components for our custom Cobot workstation, seamlessly integrating AI Vision System and a PLC-driven safety system. They supported us at every step of the process and delivered the project on time and budget."
Plant Manager
Major Manufacturer
"We can focus on our true business and let Phoenix do what they're good at. We've saved millions...but the soft costs (less wasted labor hours, increased morale, etc.) are the most valuable part of this relationship."
Grady M., Vice President
Allison Transmission
“Crown’s partnership with Phoenix for the past 12 years has helped us grow our business and serve our customers, effectively and successfully.”
Jessica A, Sales Support Manager
Crown Packaging Corp.
“Over the past 20 years, our partnership with Phoenix Assembly has grown into an integral part of our business success. What began as a straightforward relationship with Phoenix Assembly providing warehouse services, has evolved to include logistics, assembly and test operations among others for significant and sustained growth for both organizations.”
Peter Geddes, Executive Director of Procurement
Alps Alpine North America, Inc.
“Phoenix’s focus on collaboration and transparency supports our commitment--the right material at the right time.”
Paula R, Project Leader
Eaton
"We were very impressed and pleased with Phoenix Technologies designs, customized cobots and installation of assembly lines at our facility."
Vice President
Automative Assemblies Company
Key Benefits
Automation that performs under pressure
Phoenix Technologies delivers right-sized automation that reduces labor dependency, improves takt time, maintains consistent quality, and integrates seamlessly with your existing equipment—giving you flexible, reliable systems that scale with your production needs.
Targeted Labor Optimization
Automation takes on repetitive, labor-heavy tasks so skilled operators can focus on higher-value work—improving output without increasing headcount.
Takt Time Performance
Our systems are engineered to maintain cycle-time targets with predictable, repeatable precision across every shift.
Flexible, Retoolable Automation
Modular tooling and recipe-driven controls allow fast changeovers and easy adaptation to new parts, programs, or production requirements.
Consistent Quality Standards
In-line inspection, error-proofing, and standardized processes ensure every part meets spec—regardless of operator or shift.
GET STARTED
Ready to simplify the complex?
Let’s talk about how we can optimize your supply chain from concept to delivery.




